Better Living Home and Garden

How long does a full garden build take?

Programme length depends on size and complexity, but most full redesigns take several weeks from ground preparation to planting.

Do you provide both design and construction?

Yes. We offer a complete design and build service, ensuring continuity from concept to completion.

Can you work with an existing design?

Yes. We can build from supplied drawings or collaborate with external designers where required.

Better Living Groundworks

How deep should a sub-base be for commercial paving?

Depth varies depending on loading requirements, ground conditions and intended use. Specification is typically defined by an engineer or project consultant.

Can you install SuDS-compliant drainage systems?

Yes. We install systems designed to manage surface water responsibly, including attenuation and permeable paving solutions.

Do you coordinate with other contractors on site?

Yes. We regularly work alongside principal contractors and specialist trades to ensure correct sequencing and compliance.

Better Living Skyline

Can you work within strict structural load limits?

Yes. All build-ups are designed in accordance with structural guidance and agreed load capacities.

How do you protect waterproofing membranes?

We coordinate closely with membrane contractors and install appropriate protection layers and root barriers before finishes are applied.

Do you offer maintenance after installation?

Yes. Planned maintenance packages are available to protect planting, drainage and compliance over time.